What we offer

  • An independent maritime logistic services provider
  • Services include project preparation, project engineering, project management, project execution

OWL HEAVY LIFT

  • Safe and economic solutions for renewable heavy lift requirements
  • Develops projects together with the client and Marine Warranty Surveyor
  • Heavy lift operations for the purpose of:
    • Maintenance of turbines in deep sea / exposed areas
    • Wind turbine integration
    • Secondary steel lifts
    • Serving bottom fixed & floating turbines
    • No seabed interference
  • Is fully independent 
  • Will own and operate dedicated Heavy lift vessels
  • First newbuild delivery is planned for early 2026
  • Vessels are specifically designed and optimized for the Renewable industry


OWL SHEERLEGS

  • Safe and economic solutions for renewable heavy lift requirements
  • Develops projects together with the client and Marine Warranty Surveyor
  • Heavy lift operations for the purpose of:
    • Floating Wind turbine integration
    • Floating Wind turbine foundation integration / launch
    • Able to serve all floater types
    • Mobile in during operations
    • No seabed interference
  • Is fully independent
  • Will own and operate dedicated Heavy lift vessels
  • First newbuild delivery is planned for early 2026
  • Frontrunner can be sooner if required
  • Vessels are capable to perform high accuracy operations, specifically designed and optimized for the Renewable industry’s


OWL SUBSEA ROCK INSTALLATION

OWL 020
  • Safe and economic solutions for subsea rock requirements
  • Develops projects together with the client and Marine Warranty Surveyor
  • Installation of subsea rock for the purpose of:
    • Scour protection around foundations such as monopiles
    • Seabed preparations prior to installation of gravity base structures
    • Covering cables
    • Etc.
  • Is fully independent from the ‘Big 4’
  • Is a JV between OWL and a renown 1st class vessel owner operator
  • Will own and operate dedicated SRI vessels
  • First newbuild delivery is planned for mid 2025, frontrunner can be sooner if required
  • Vessels are specifically designed and optimized for the Renewable industry